– Laying of electrical cables between designated points at the Port of Houston.
– Preparation of cable paths with minimal disruption to existing infrastructure.
– Use of cable guides to eciently navigate cables toward the manholes.
– Management of water accumulation within the manholes, requiring daily monitoring and drainage.
– Conducting post-installation tests to verify continuity and connections to each transformer.
– Coordination of operations with the port’s electrical maintenance team to avoid disruptions to ongoing port
activities.
Specialists in design, construction and project management for the industrial, commercial and telecommunications sectors.